M70V Series Connection Manual
2.5 Operation Panel I/O Unit
37
Dimension and names of parts
[FCU7-DX710/ FCU7-DX711]
(Note)
Use M3x25 screws (with spring washer and plain washer) when mounting the operation panel I/O unit.
<Dimension drawing for installing on the panel>
<Installation on the back side of the keyboard>
Operation panel I/O unit can be installed on the back side
of the keyboard.
(4) (5)
(1)
(10)
(2)
(7)
(8)
(11)
(12)
110 (
116
179
(13)
Space required for wiring)
116 (
)
106 ± 0.3
4- M3
179 (
)
171 ±
0.3
Unit outline
Screw
Unit outline
NCKB
Connector
Fixing screw (4 pcs.) M3x25
(with plain washer and spring washer)
Summary of Contents for M70V Series
Page 1: ......
Page 13: ......
Page 15: ......
Page 17: ......
Page 19: ......
Page 21: ......
Page 25: ......
Page 26: ...1 1 System Configuration ...
Page 36: ...11 2 General Specifications ...
Page 110: ...85 3 Installation ...
Page 120: ...95 4 Connection ...
Page 173: ...4 Connection MITSUBISHI CNC 148 ...
Page 174: ...149 付録 Ap 1 章 149 Appendix 1 Cable ...
Page 220: ...195 付録 Ap 2 章 195 Appendix 2 EMC Installation Guidelines ...
Page 232: ...207 付録 Ap 3 章 207 Appendix 3 Restrictions for Lithium Batteries ...
Page 241: ...Appendix 3 Restrictions for Lithium Batteries MITSUBISHI CNC 216 ...
Page 242: ...217 付録 Ap 4 章 217 Appendix 4 Precautions for Compliance to UL c UL Standards ...
Page 246: ......
Page 250: ......