M70V Series Connection Manual
Appendix 2.5 Measures for Wiring in Panel
201
(3) Servo communication cable [SH21 cable]
-
Use a shield clamp within 10cm from the panel's inlet/outlet.
-
When using a ferrite core, install it on both ends of the connected units.
(4) Ethernet cable
-
Use a shielded cable. Use a shield clamp within 10cm from the panel's inlet/outlet.
-
When using a ferrite core, install it on both ends of the connected units.
SH21B
Control panel
cable
Control panel
Control unit
Drive section unit
Shield clamp
Ferrite core
Control panel
Control unit
Shield clamp
Ferrite core
Peripheral device
Ethernet cable
Operation panel
Summary of Contents for M70V Series
Page 1: ......
Page 13: ......
Page 15: ......
Page 17: ......
Page 19: ......
Page 21: ......
Page 25: ......
Page 26: ...1 1 System Configuration ...
Page 36: ...11 2 General Specifications ...
Page 110: ...85 3 Installation ...
Page 120: ...95 4 Connection ...
Page 173: ...4 Connection MITSUBISHI CNC 148 ...
Page 174: ...149 付録 Ap 1 章 149 Appendix 1 Cable ...
Page 220: ...195 付録 Ap 2 章 195 Appendix 2 EMC Installation Guidelines ...
Page 232: ...207 付録 Ap 3 章 207 Appendix 3 Restrictions for Lithium Batteries ...
Page 241: ...Appendix 3 Restrictions for Lithium Batteries MITSUBISHI CNC 216 ...
Page 242: ...217 付録 Ap 4 章 217 Appendix 4 Precautions for Compliance to UL c UL Standards ...
Page 246: ......
Page 250: ......