Calculation example of panel internal heating value
(1) Calculation of unit heating value
Heating value (W)
Total heating value of units (W):
28W (= control unit + display unit + keyboard unit + operation panel I/O unit)
Total heating value (W) by machine input (D1):
5.6W (=24V (total heating value when the 32 points are simultaneously turned ON) × 7.3mA × 32)
... 24V (current consumption per point of the operation panel I/O unit DI) divided by 3.3k
Ω
≈
7.3mA
Total heating value W = 33.6W (28 + 5.6)
(2) Calculation of operation panel cooling capacity
Tolerance value for temperature rise (
⊿
t)
Panel internal temperature (according to each unit's specification) T
≤
55C°
Panel peripheral temperature (according to machine's specification) Ta
≤
45C°
Tolerance value for internal temperature rise
⊿
T = 10C° (T - Ta)
Heat radiation area (A)
The surface of the molded unit, which has lower radiation capacity than the base plate surface, should be
excluded for the heat radiation area in principle. The bottom of the operation panel, which has difficulty in
radiating due to the temperature distribution, should also be excluded for the heat radiation area in
principle.
Heat radiation area A = 0.71mm
2
(
≈
0.6 × 0.12 + 0.6 × 0.5 × 2 - (0.26 + 0.14) × 0.2 + 0.12 × 0.5 × 2)
(Top surface) (Front, rear surface) (Unit surface) (Both sides surface)
Operation panel cooling capacity (W1)
Calculate the cooling capacity to keep the temperature rise in the operation panel less than 10°C.
Cooling capacity W1 = 42.6W (6 × A ×
⊿
T)
(3) Comparison of heating value and operation panel cooling capacity
The operation panel cooling capacity is over the heating value, which presumed no need to install the heat
exchanger.
(4) Confirmation with the actual machine
The result of the calculation above is only a rough indication. The actual temperature rise may differ according
to the structure of the operation panel. Be sure to confirm the temperature rise value in the operation panel
when the machine is running.
Summary of Contents for M70V Series
Page 1: ......
Page 13: ......
Page 15: ......
Page 17: ......
Page 19: ......
Page 21: ......
Page 25: ......
Page 26: ...1 1 System Configuration ...
Page 36: ...11 2 General Specifications ...
Page 110: ...85 3 Installation ...
Page 120: ...95 4 Connection ...
Page 173: ...4 Connection MITSUBISHI CNC 148 ...
Page 174: ...149 付録 Ap 1 章 149 Appendix 1 Cable ...
Page 220: ...195 付録 Ap 2 章 195 Appendix 2 EMC Installation Guidelines ...
Page 232: ...207 付録 Ap 3 章 207 Appendix 3 Restrictions for Lithium Batteries ...
Page 241: ...Appendix 3 Restrictions for Lithium Batteries MITSUBISHI CNC 216 ...
Page 242: ...217 付録 Ap 4 章 217 Appendix 4 Precautions for Compliance to UL c UL Standards ...
Page 246: ......
Page 250: ......