36
5 INSTALLATION AND WIRING
5.2 Installation
5.2
Installation
Fixing the IO-Link module
When fixing the IO-Link module, tighten all the two screws in the module fixing holes.
Otherwise, the module will be greatly affected by vibration, causing failure of the module.
When installing the module, tighten screws within the following torque range.
• Do not put oil on the screw. Failure to do so may damage the screw.
• Tighten the screw with an applicable screwdriver. Tightening it with an inapplicable screwdriver may
damage the screw.
Screw type
Tightening torque range
Module mounting screw (M6 screw)
4.90 to 5.20N
m
FG screw (M4 screw)
1.02 to 1.38N
m
Summary of Contents for CC-Link IE Field NZ2GF12A-60IOLH8
Page 1: ...CC Link IE Field Network Waterproof Remote IO Link Module User s Manual NZ2GF12A 60IOLH8 ...
Page 2: ......
Page 30: ...28 3 PROCEDURES BEFORE OPERATION MEMO ...
Page 100: ...98 8 MODULE FUNCTION BLOCKS MEMO ...
Page 109: ...9 PROGRAMMING 9 2 Program Example of Setting Parameters Using a Dedicated Instruction 107 9 ...
Page 116: ...114 9 PROGRAMMING 9 3 Example of Program to Communicate with an IO Link Device ...
Page 118: ...116 10 MAINTENANCE AND INSPECTION MEMO ...
Page 155: ...APPX Appendix 7 Additional or Changed Functions 153 A MEMO ...
Page 157: ...I 155 MEMO ...
Page 161: ......