Code
Contents
Remarks
Causes
Check procedures/
corrective measures
2AR
3-5-12
C332
Scanner watchdog
problem
The main routine does not
run within 8.192 ms of the
main switch being turned
on.
C340
Original detection
position problem
The CPU IC5 in the scanner
control PCB cannot store
initial data from the origi-
nal size sensor correctly.
C400
Polygon motor
synchronization problem
The polygon motor does
not reach the stable speed
within 20 s of the polygon
motor remote signal turning
on.
C401
Polygon motor
steady-state problem
The polygon motor rotation
is not stable for 600 ms
after the polygon motor
rotation has been stabi-
lized.
Defective
scanner
control PCB.
Poor contact
of the connec-
tor terminals.
Defective
original size
sensor.
Defective main
PCB or scan-
ner control
PCB.
Poor contact
of the polygon
motor connec-
tor terminals.
Defective
polygon motor.
Defective
power source
PCB.
Poor contact
of the polygon
motor connec-
tor terminals.
Defective
polygon motor.
Defective
power source
PCB.
Replace the scanner control
PCB and check for correct
operation.
Check the connection of con-
nector CN8 on the scanner
control PCB and the continuity
across the connector terminals.
Remedy or replace if neces-
sary.
Replace the original size
sensor.
Replace the main PCB or
scanner control PCB and
check for correct operation.
Reinsert the connector. Also
check for continuity within the
connector cable. If none, repair
or replace the cable.
Replace the LSU.
Check if 24 V DC is present
at CN6-1 on the power
source PCB. If not, replace
the power source PCB.
Reinsert the connector. Also
check for continuity within the
connector cable. If none, repair
or replace the cable.
Replace the LSU.
Check if 24 V DC is present
at CN6-1 on the power source
PCB. If not, replace the power
source PCB.
3-5-11
Summary of Contents for PointSource Ai 3010
Page 1: ...3010 S M MCA SERVICE MANUAL Published in Apr 00 2AR70765 Revision 5 PointSource Ai 3010 R...
Page 2: ...Service Manual PointSource Ai 3010...
Page 13: ...3010 S M MCA THEORY AND CONSTRUCTION SECTION I I Theory and Construction Section...
Page 14: ...2AR CONTENTS 1 1 Specifications 1 1 1 Specifications 1 1 1...
Page 18: ...2AR CONTENTS 1 2 Handling Precautions 1 2 1 Drum 1 2 1 1 2 2 Developer and toner 1 2 1...
Page 61: ...3010 S M MCA ELECTRICAL SECTION II II Electrical Section...
Page 62: ...2AR CONTENTS 2 1 Electrical Parts Layout 2 1 1 Electrical parts layout 2 1 1 1 Copier 2 1 1...
Page 92: ...3010 S M MCA III Set Up and Adjustment Section III SET UP AND ADJUSTMENT SECTION...
Page 108: ...3 1 15 2AR This page has been left blank intentionally 2AR 5...
Page 136: ...3 2 11 2AR 1 This page is intentionally left blank...
Page 191: ...3 2 62 2AR 1 This page is intentionally left blank...
Page 196: ...3 2 61 2AR 1 This page is intentionally left blank...
Page 255: ...3 2 38 2AR 1 This page is intentionally left blank...
Page 384: ...2AR 1 3 6 15 This page is intentionally left blank...
Page 398: ...3 6 27 2AR 1 3 Main PCB CN9 CN5 CN2 CN3 CN4 IC11 IC12 CN1 CN8 CN10 CN11 CN6 CN7...
Page 431: ...2AR General connection diagram 3 7 43 General wiring diagram 3 7 44 2AR 1...