3-4-3
2AR
9. Insert the other connector of the flash data change harness into CN7 on the
operation unit main PCB.
CN7
Flash data change harness
Operation unit main PCB
Flash tool assembly
Figure 3-4-2
10. Open the left 1 cover to prevent malfunctioning of the copier during the firmware
upgrading.
11. Connect the power plug and turn the main switch on. Upgrading of the operation
1 ROM IC starts and LED2 on the flash tool assembly flashes for 1 minute. LED2
remains on when upgrading is complete.
12. Turn the main switch off.
13. Remove the operation 1 ROM IC from the flash tool assembly and fit the
operation 2 ROM IC into the IC3 socket on the flash tool assembly.
14. Turn the main switch on. Upgrading of the operation 2 ROM IC starts and LED2
on the flash tool assembly flashes for 3 minutes. LED2 remains on when
upgrading is complete.
15. Turn the main switch off.
16. Detach the connector of the flash data change harness from the operation unit
main PCB.
17. Close the left 1 cover and refit the removed covers.
18. Turn the main switch on.
19. Enter the maintenance mode.
20. Execute maintenance item U000 to output a list of the current settings for
maintenance items.
21. Compare the lists output in steps 2 and 20. If there are any differences, reenter
the data in accordance with the values on the list output in step 2.
22. Exit the maintenance mode.
Summary of Contents for PointSource Ai 3010
Page 1: ...3010 S M MCA SERVICE MANUAL Published in Apr 00 2AR70765 Revision 5 PointSource Ai 3010 R...
Page 2: ...Service Manual PointSource Ai 3010...
Page 13: ...3010 S M MCA THEORY AND CONSTRUCTION SECTION I I Theory and Construction Section...
Page 14: ...2AR CONTENTS 1 1 Specifications 1 1 1 Specifications 1 1 1...
Page 18: ...2AR CONTENTS 1 2 Handling Precautions 1 2 1 Drum 1 2 1 1 2 2 Developer and toner 1 2 1...
Page 61: ...3010 S M MCA ELECTRICAL SECTION II II Electrical Section...
Page 62: ...2AR CONTENTS 2 1 Electrical Parts Layout 2 1 1 Electrical parts layout 2 1 1 1 Copier 2 1 1...
Page 92: ...3010 S M MCA III Set Up and Adjustment Section III SET UP AND ADJUSTMENT SECTION...
Page 108: ...3 1 15 2AR This page has been left blank intentionally 2AR 5...
Page 136: ...3 2 11 2AR 1 This page is intentionally left blank...
Page 191: ...3 2 62 2AR 1 This page is intentionally left blank...
Page 196: ...3 2 61 2AR 1 This page is intentionally left blank...
Page 255: ...3 2 38 2AR 1 This page is intentionally left blank...
Page 384: ...2AR 1 3 6 15 This page is intentionally left blank...
Page 398: ...3 6 27 2AR 1 3 Main PCB CN9 CN5 CN2 CN3 CN4 IC11 IC12 CN1 CN8 CN10 CN11 CN6 CN7...
Page 431: ...2AR General connection diagram 3 7 43 General wiring diagram 3 7 44 2AR 1...