®
GRAFIK Eye
®
QS Control Unit Installation and Operation Guide 10
Completing Installation of the GRAFIK Eye
®
QS Control Unit
1. Mount the control unit in the wallbox as
shown using the four screws pro vid ed.
Note:
Follow all local and national
electrical codes when installing IEC
PELV/NEC
®
Class 2 wiring with line
voltage/mains wiring.
2. Verify installation:
• Restore power.
• Press the top scene button. The LED
will light.
• Press the zone raise and lower buttons.
Make sure the control unit is dimming all
connected loads.
3. Apply the protective overlay to the
control unit.
Note:
When tightening mounting
screws, make sure that the hinged
cover and faceplate will open fully,
as shown.
Wall
7.9 in
(200 mm)
3.5 in
(87 mm)
3.75 in
(95 mm)
Protective overlay
(apply after installation)
Note:
To access micro USB
receptacle, pull down to remove
lower hinged faceplate.