Operating Manual Leica EM ACE600
Version 01/19
Page 62
Grid stage and standard stage with a diameter of 60 mm:
Standard stage and quartz holder mounted on the EM ACE600
After choosing and starting a protocol for e-beam evaporation the system will
perform the following steps automatically (see 3.9.2 and 3.9.3).
Pumping
Pumping until base vacuum is reached
Setting the stage
Degassing the target material (if activated)
Opening the shutter and starting rotation (if activated)
Evaporating until final thickness is reached or defined time has elapsed
Closing the shutter
Displaying the results of the process, venting or staying in vacuum
Caution!
Be careful when reloading a just used e-beam source.
The inside of the source can get extremely hot.