Operating Manual Leica EM ACE600
Version 01/19
Page 75
Make sure to work fast, the cement dries very quickly.
… and put the platinum pellet in.
Clean the squeezed out cement with a tissue.
The platinum carbon rod is prepared for melting in (degassing, image shows a
melted in rod).
When changing from carbon evaporation to platinum or the other way round, the
collet is screwed out of the collet holder. Usually this can be done by hand. In
case it is too tight, the wrench number 5 is used.