14
28-0724/02
1.3
UNPACKINg THE DISPENSER
1. Set shipping carton upright on the floor.
2. Cut band and remove.
3. Open top of carton and remove interior packing.
4. Lift carton up and off of the dispenser.
5. Remove wood shipping base from the bottom of the dispenser. (Support dispenser
while removing shipping base.)
1.4
DRAIN SPIDER
The Drain Spider is located directly in the center of the bin under the ice shroud. The coldplate
has a cavity designed to hold the drain spider. During shipment or installation, the drain spider
may become dislodged from its original position.
Prior to installing the dispenser, ensure the drain spider is in the correct position. This will
prevent drain clog issues. Inspect the lower bin area and reach under the shroud to ensure the
drain spider is secure in the coldplate cutout. If the spider is not in place, proceed with the
following steps:
1. Remove clip (2) and pin (4) from agitator bar (3).
2. Remove agitator bar from paddle wheel (5).
3. Remove paddle wheel.
4. Remove ice shroud (1) by lifting back then out of the bin.
5. Locate the drain spider and reinstall in the coldplate cavity where the drain line exits
(see figure above).
6. Reinstall all components. Ensure agitator clip is locked:
DRAIN SPIDER
Summary of Contents for BEVARIETY MCY-22
Page 28: ...28 28 0724 02 3 Illustrations and Parts Listings 3 1 Decals and Labels 1 1 2 3 4 5 6 6 7 7 ...
Page 30: ...30 28 0724 02 3 2 Final Assembly Post Mix IBD and Ice Dispenser ...
Page 49: ...49 28 0724 02 Notes ...
Page 69: ...69 28 0724 02 Notes ...
Page 70: ...70 28 0724 02 5 3 MVU Assembly 3 4 5 6 7 8 9 10 11 12 13 14 5 ...
Page 86: ...86 28 0724 02 ...
Page 89: ...89 28 0724 02 6 13 Dispenser Connections Valve Map Summary CO2 Water and Syrup ...
Page 90: ......
Page 91: ......
Page 92: ...92 28 0724 02 6 16 22 Bevariety ACIB Wiring Plumbing Diagram 115V 60Hz ...
Page 93: ...93 28 0724 02 6 17 30 Bevariety ACIB Wiring Plumbing Diagram 115V 60Hz ...