![background image](http://html1.mh-extra.com/html/lancer/bevariety-mcy-22/bevariety-mcy-22_installation-and-service-manual_3500568022.webp)
22
28-0724/02
8. Position the Lower CO
2
Recess Foam Insulation over the check valve with the slot
on the bottom side. Press into place as shown. The foam should be flush with the
sheet metal mounting plate.
9. Clean area around drain tubes. Slightly pinch elbow fitting to form oval.
10. Slide elbow fitting over flared end of drain tube. Push elbow fitting back over tube
until flare reaches angle point.
Summary of Contents for BEVARIETY MCY-22
Page 28: ...28 28 0724 02 3 Illustrations and Parts Listings 3 1 Decals and Labels 1 1 2 3 4 5 6 6 7 7 ...
Page 30: ...30 28 0724 02 3 2 Final Assembly Post Mix IBD and Ice Dispenser ...
Page 49: ...49 28 0724 02 Notes ...
Page 69: ...69 28 0724 02 Notes ...
Page 70: ...70 28 0724 02 5 3 MVU Assembly 3 4 5 6 7 8 9 10 11 12 13 14 5 ...
Page 86: ...86 28 0724 02 ...
Page 89: ...89 28 0724 02 6 13 Dispenser Connections Valve Map Summary CO2 Water and Syrup ...
Page 90: ......
Page 91: ......
Page 92: ...92 28 0724 02 6 16 22 Bevariety ACIB Wiring Plumbing Diagram 115V 60Hz ...
Page 93: ...93 28 0724 02 6 17 30 Bevariety ACIB Wiring Plumbing Diagram 115V 60Hz ...