20
28-0724/02
1.12
CONDENSATION INSULATION INSTALLATION
1. Remove cup rest and drip tray.
2. Wrap the Inlet Tube Insulation Tape around the syrup inlet tubing. Start by placing
the insulation behind the syrup inlet and wrap around to the front. Secure the
insulation by using approximately 2” of duct tape on the overlap joint as show.
Repeat this step for each syrup inlet (except the ambient tube inlets).
3. Position the Upper CO
2
Recess Cover over the relief valve and press into place as
show. The foam should be flush with the sheet metal mounting plate.
4. Place the Probe Nut Insulation on the probe cord. Slide the Probe Nut Insulation into
the opening of the plastic nut. The Probe Nut Insulation should be flush with the front
of the plastic nut.
Summary of Contents for BEVARIETY MCY-22
Page 28: ...28 28 0724 02 3 Illustrations and Parts Listings 3 1 Decals and Labels 1 1 2 3 4 5 6 6 7 7 ...
Page 30: ...30 28 0724 02 3 2 Final Assembly Post Mix IBD and Ice Dispenser ...
Page 49: ...49 28 0724 02 Notes ...
Page 69: ...69 28 0724 02 Notes ...
Page 70: ...70 28 0724 02 5 3 MVU Assembly 3 4 5 6 7 8 9 10 11 12 13 14 5 ...
Page 86: ...86 28 0724 02 ...
Page 89: ...89 28 0724 02 6 13 Dispenser Connections Valve Map Summary CO2 Water and Syrup ...
Page 90: ......
Page 91: ......
Page 92: ...92 28 0724 02 6 16 22 Bevariety ACIB Wiring Plumbing Diagram 115V 60Hz ...
Page 93: ...93 28 0724 02 6 17 30 Bevariety ACIB Wiring Plumbing Diagram 115V 60Hz ...