![background image](http://html1.mh-extra.com/html/lancer/bevariety-mcy-22/bevariety-mcy-22_installation-and-service-manual_3500568040.webp)
40
28-0724/02
4.
LEV INSTALLATION
4.1
RECEIVINg
Each unit is completely tested under operating conditions and thoroughly inspected before
shipment. At time of shipment, the carrier accepts the unit and any claim for damage must be
made with the carrier. Upon receiving units from the delivering carrier, carefully inspect carton
for visible indication(s) of damage. If damage exists, have carrier note same on bill of lading
and file a claim with the carrier.
4.2
REMOVAL OF EXISTINg VALVE
1. Turn off carbonated water supply to dispenser to depressurize the system.
2. Turn off all syrup supplies to dispenser.
3. Operate each valve to ensure complete depressurization of water and syrup in the
system.
4. Remove existing valve and mounting block. Reuse the mounting block screws.
4.3
INSTALLATION OF LEV® VALVE
1. Slide I.D. panel up to expose cover mounting screw.
2. Loosen cover mounting screw (do not remove) and remove cover.
3. Turn both stems on mounting block to the CLOSED position.
4. Lift up wire retainer and remove mounting block from valve.
5. Replace the inlet water and syrup o-rings on dispenser valve fittings.
6. Lubricate o-rings on the fittings and mounting block with water or an FDA-approved
lubricant.
7. If syrup-out light is furnished with valve, run light wires through mounting block and
valve plate. Connect wiring to pressure switch in product line (24 VAC power supply
required).
8. Install mounting block to valve plate using four mounting screws removed from
existing mounting block.
9. Install valve on mounting block. Push wire retainer down. This will lock valve to
mounting block. (White stems must be in closed position.)
10. Turn on carbonator water supply and syrup supply to dispenser.
11. Turn both white stems on mounting block to the OPEN position. Top of stem will
lock wire retainer in position.
12. If electric version, reconnect to 24 VAC power supply.
13. Operate the valve momentarily to ensure flow of carbonated water and syrup.
Note:
Model 100 valves are factory preset for a flow rate of 3.0 ounces per second; an
adjustment may be required. Model 145 valves are factory preset for a flow rate of
4.5 ounces per second; an adjustment may be required.
14. Adjust water flow to correct flow rate.
15. Adjust ratio (°Brix) to correct setting (see following instructions).
16. Install cover on valve and tighten cover mounting screw.
17. Slide down I.D. panel.
WARNING!
If dispenser is connected to electrical power, the unit must be
properly grounded to avoid possible fatal electrical shock or
serious bodily injury.
Summary of Contents for BEVARIETY MCY-22
Page 28: ...28 28 0724 02 3 Illustrations and Parts Listings 3 1 Decals and Labels 1 1 2 3 4 5 6 6 7 7 ...
Page 30: ...30 28 0724 02 3 2 Final Assembly Post Mix IBD and Ice Dispenser ...
Page 49: ...49 28 0724 02 Notes ...
Page 69: ...69 28 0724 02 Notes ...
Page 70: ...70 28 0724 02 5 3 MVU Assembly 3 4 5 6 7 8 9 10 11 12 13 14 5 ...
Page 86: ...86 28 0724 02 ...
Page 89: ...89 28 0724 02 6 13 Dispenser Connections Valve Map Summary CO2 Water and Syrup ...
Page 90: ......
Page 91: ......
Page 92: ...92 28 0724 02 6 16 22 Bevariety ACIB Wiring Plumbing Diagram 115V 60Hz ...
Page 93: ...93 28 0724 02 6 17 30 Bevariety ACIB Wiring Plumbing Diagram 115V 60Hz ...