![background image](http://html1.mh-extra.com/html/lancer/bevariety-mcy-22/bevariety-mcy-22_installation-and-service-manual_3500568006.webp)
6
28-0724/02
Installation Overview
Installation Requirements:
The following parts and tooling should be used on all Bevariety™ dispensing systems:
• TCCC-authorized flushable beverage tubing suitable to length and number of flavors
• 1/2” or 3/8” tubing on all water lines
• TCCC-authorized clamps and connectors
• TCCC-authorized tubing cutters and Oetiker pliers
• TCCC-authorized drain tubing
• Ratio cup
• MVU syrup separator
• Sanitizing agent for ice bin
• Brand decals for LEVs and MVU, if applicable
• 50 ml graduated cylinders for flavor shots (MVU option only)
• Pressure gauge to measure CO
2
pressure
• 5/32nds Allen wrench
• Level
Utility Requirements:
The unit requires each of the following utilities:
• 120 VAC, 20 amp dedicated circuits both the pump deck and dispenser
• 1/2” water supply line at the dispenser at 40-65 psig. Check water pressure at source.
If pressure is below 40 psig with carbonator running, add a booster.
• Floor drain within 5 ft of unit
• 3/8” CO
2
supply line
Summary of Contents for BEVARIETY MCY-22
Page 28: ...28 28 0724 02 3 Illustrations and Parts Listings 3 1 Decals and Labels 1 1 2 3 4 5 6 6 7 7 ...
Page 30: ...30 28 0724 02 3 2 Final Assembly Post Mix IBD and Ice Dispenser ...
Page 49: ...49 28 0724 02 Notes ...
Page 69: ...69 28 0724 02 Notes ...
Page 70: ...70 28 0724 02 5 3 MVU Assembly 3 4 5 6 7 8 9 10 11 12 13 14 5 ...
Page 86: ...86 28 0724 02 ...
Page 89: ...89 28 0724 02 6 13 Dispenser Connections Valve Map Summary CO2 Water and Syrup ...
Page 90: ......
Page 91: ......
Page 92: ...92 28 0724 02 6 16 22 Bevariety ACIB Wiring Plumbing Diagram 115V 60Hz ...
Page 93: ...93 28 0724 02 6 17 30 Bevariety ACIB Wiring Plumbing Diagram 115V 60Hz ...