![Kverneland Vicon RF 2235 Operating Manual Download Page 35](http://html.mh-extra.com/html/kverneland/vicon-rf-2235/vicon-rf-2235_operating-manual_2012970035.webp)
Delivery and assembly
35
Delivery and assembly
Checking the
scope of delivery
The delivery arrives fully assembled
The implement is delivered fully assembled. The implement must be
checked after delivery. Check loose parts against the following check-
list. If any parts of the implement have not been assembled or are mis-
sing, please contact your dealer.
N
OTE
If parts are missing or have been damaged during transportation,
please submit a complaint immediately to the dealer, importer or the
manufacturer.
Checklist for loose parts
Quantity
Operating manual
1
Spare parts list
1
Cardan shafts
1
Wheel wedge
2
Special accessories
See delivery note
All manuals and user guides at all-guides.com