92
⑸
Sight at the next target and press OBS to
continue the measurement.
·
Press REC to record the measurement results.
Sight the next
OBS
Set-out line ( L)
N: 2.219m
E: 1.115m
Z: -0.097m
HAR 27 43’ 58”
R. HT NO YES
18. Point projection
Point projection is used for projecting a point onto the baseline. The point to project can be either measured or
input. After projecting, the total station will calculate the coordinate of “Projecting Point”, and display the distance
between the 1
st
point and the “Projecting Point”.
18.1 Defining baseline
Defined baseline can be used in both setting-out line measurement and point projection.
procedure
Operation
Display
(1)
Under the measuring mode , define the
function of point projection onto the key
allocate
PROJ
Meas PC -30
PPM 0
ZA 92 36’ 25”
HAR 30 25’ 18”
PROJ LINE HSET EDM