116
(6) Return to set-out road s menu.
Set out roads
1
.
Stn data
2. angle
3. coord
4. Set Out
5. EDM
19.2.3 Setting Out
After Setting station point and backsight point, it is possible to perform Setting Out measurement.
PROCEDURE
Operating Procedure
Operation
Display
⑴
Select “4. Set Out” in the “Set Out Roads
Screen.”
Select “4.
Set Out”
Set out roads
1
.
Stn data
2. Set H angle
3. Set Back Sight Pt
4. Set Out
5. EDM
⑵
Enter the start stake number, increment, the
horizontal distance from side stake points to
center line (Offset L: the horizontal distance
from left stake point to center line. Offset L: the
horizontal distance from left stake point to
center line.) and the height difference from the
side stake to center line.
Alignment Setout
StartC 0.000
Incre. 0.000
Offs. L 0.000 m
Offs. R 0.000 m
HtDi.L 0.000 m
HtDi.R 0.000 m
OK
⑶
Press ENT, the chainage and offset screen is
displayed.
ENT
(Main set out screen )
Alignment Setout
Chain
:
1000.000 3
Offs
:
0.000
HtDi
:
0.000
Tgt.h
:
0.000 m
P1
LOFS ROFS +CHG -CHG
SLOPE