90
(3)
Press F4 OK. The coordinate value of the required point is
calculated and displayed.
(to enter the second page, press F4 P1).
·
REC: records the coordinate value as a known point data.
(
Refer to “21. Recording in Record Mode”
)
·
Press F1 S-O to perform setting-out measurement of the
required point. (Refer to“11. Setting-Out Measurement”)
OK
Set out line (PT)
Np: 2705201.124
Ep: 121144.997
Zp: 89.297
S-O REC P1
Set out line (PT)
Dist: 40.212 m
Angle: 310°51′36″
Tg. h: 1.650 m
S-O REC P2
17.3 Setting-out Line (Line)
Setting-out line line measurement is used to measures the horizontal distance and vertical distance from the
required point to the baseline. The base line should be defined before seting out the straight line.