
V1.00/EN/00741192/2021-03-30 [IPC 300]
65
6 Special device functions
Overcurrent
The specifications in % refer to load current changes
Number of
heating ele-
ments
Single-phase op-
eration
6
10 %
5
13 %
4
17 %
3
25 %
2
50 %
Example for 2
heating ele-
ments
N
L1
IPC 300
D
1D
H
As a general rule, load monitoring does not yet take place during the soft start
phase (which can last for an extended period due to active current limiting) as
the standard working range of the load has not yet been reached. Teach-In
cannot yet be performed in this phase either.
Summary of Contents for 709051
Page 8: ...8 V1 00 EN 00741192 2021 03 30 IPC 300 Contents...
Page 26: ...2 Mounting 26 V1 00 EN 00741192 2021 03 30 IPC 300...
Page 48: ...4 Operation 48 V1 00 EN 00741192 2021 03 30 IPC 300...
Page 62: ...5 Configuration 62 V1 00 EN 00741192 2021 03 30 IPC 300...
Page 76: ...6 Special device functions 76 V1 00 EN 00741192 2021 03 30 IPC 300...
Page 84: ...8 Error messages and alarms 84 V1 00 EN 00741192 2021 03 30 IPC 300...
Page 90: ...10 Technical data 90 V1 00 EN 00741192 2021 03 30 IPC 300...
Page 91: ...V1 00 EN 00741192 2021 03 30 IPC 300 91 11 Certificate 11 1 China RoHS...