7. Connect the heater supply and radiator upper hoses to manifold.
8. Connect the fuel line (4). Refer to
Fuel System/Fuel Delivery/FITTING, Quick Connect - Standard
Procedure
.
Fig. 232: INTAKE TORQUE SEQUENCE 3.8L
Courtesy of CHRYSLER LLC
9. Install the upper intake manifold. See
Engine/Manifolds/MANIFOLD, Intake - Installation
.
10. Connect negative battery cable.
11. Fill the cooling system.
12. Connect the negative battery cable.
VALVE TIMING
STANDARD PROCEDURE
VALVE TIMING VERIFICATION
1. Remove front cylinder head cover and all 6 spark plugs.
2. Rotate engine until the #2 piston is at TDC of the compression stroke.
3. Install a degree wheel on the crankshaft pulley.
4. With proper adaptor, install a dial indicator into #2 spark plug hole. Using the indicator find TDC on the
compression stroke.
5. Position the degree wheel to zero.
6. Remove dial indicator from spark plug hole.
7. Place a 5.08 mm (0.200 in.) spacer between the valve stem tip of #2 intake valve and rocker arm pad.