31. Install the PCV hose (1).
32. Fill the cooling system. Refer to
Cooling - Standard Procedure
.
Fig. 42: Hose Assembly & IAT Sensor
Courtesy of CHRYSLER LLC
33. Install the air cleaner housing, inlet hose (1) and inlet air temp sensor (IAT) (2). See
Engine/Air Intake
System/AIR CLEANER - Installation
.
34. Evacuate and recharge A/C system. Refer to
Heating and Air Conditioning/Plumbing - Standard
Procedure
.
35. Install new oil filter. Fill engine crankcase with proper oil to correct level. Refer to
Vehicle Quick
Reference/Capacities and Recommended Fluids - Specifications
.
2010 Jeep Wrangler Sport
2010 ENGINE 3.8L - Service Information - Wrangler
viernes, 1 de octubre de 2021 05:18:30 p. m.
Page 35
© 2011 Mitchell Repair Information Company, LLC.