Fig. 156: Installing Side Rail
Courtesy of CHRYSLER LLC
1. Oil ring expander (5).
2. Lower oil ring side rail (4).
3. Upper oil ring side rail.
4. No. 2 Intermediate piston ring (2).
5. No. 1 Upper piston ring (1).
2. Install the side rail by placing one end between the piston ring groove and the expander. Hold end firmly
and press down the portion to be installed until side rail is in position.
Do not use a piston ring
expander.
3. Install lower side rail first and then the upper (1) side rail.
4. Install No. 2 piston ring and then No. 1 piston ring.
Fig. 157: PISTON RING END GAP POSITION
Courtesy of CHRYSLER LLC
1 - SIDE RAIL END
2010 Jeep Wrangler Sport
2010 ENGINE 3.8L - Service Information - Wrangler
viernes, 1 de octubre de 2021 05:18:31 p. m.
Page 126
© 2011 Mitchell Repair Information Company, LLC.