S e c t i o n 4
© 2020, JAPAN CASH MACHINE CO., LTD.
4 - 1
This section provides disassembly and reassembly
instructions for the UBA Pro RT/RQ™ Series
Banknote Recycler (RT/RQ).
This section contains the following information:
UBA Pro Unit, Recycler and Cash Box Removal
RT/RQ Frame Unit Disassembly In Common
Tool Requirements
The following tools will be required to perform
disassembly and reassembly.
•
#1 Phillips Screwdriver
•
Flat Blade Screwdriver
•
E-Ring Holder
•
Tweezer
UBA Pro Unit, Recycler and Cash
Box Removal
To remove the UBA Pro Unit, Recycler and the
Cash Box out of the Frame, proceed as follows:
1. Pull the Lever (Figure 4-1
a
) to release the lock.
2. Slide and remove the UBA Pro Unit (Figure 4-1
b
) from the Frame (Figure 4-1
c
) as illustrated by
the Arrow
①
.
3. Press down on the Release Lever (Figure 4-1
d
)
of the Recycler (Figure 4-1
e
) installed in the RT
Transport, and pull the Recycler out of the RT
Transport in the direction indicated by Arrow
②
.
4. Press up on the Release Lever (Figure 4-1
f
) of
g
) installed in the RQ
Transport, and pull the Recycler out of the RQ
Transport in the direction indicated by Arrow
③
.
5. Pull the Cash Box Handle (Figure 4-1
h
) to
remove the Cash Box (Figure 4-1
i
) from the
Frame (Figure 4-1
c
) in the direction indicated by
Arrow
④
RT Transport Unit Removal
To remove the Transport Unit in the RT Transport,
proceed as follows:
1. Press down on the Front Transport Unit’s Release
a
).
2. Pull up the Front Transport Unit (Figure 4-2
b
) as
illustrated by the Arrow
①
.
3. Pull the Release Lever (Figure 4-2
c
).
4. Lift up and remove the Transport Unit (Figure 4-
d
) as illustrated by the Arrow
②
.
4 DISASSEMBLY/REASSEMBLY
NOTE: Calibration is required after
reassembly (Refer to “Calibration and
UBA Pro Unit, Recycler and Cash
a
c
d
①
②
③
④
f
e
g
i
h
Figure 4-1
UBA Pro Unit, Recycler and Cash Box
Removal
Figure 4-2
RT Transport Unit Removal
a
b
c
d
①
②