© 2020, JAPAN CASH MACHINE CO., LTD.
6 - 2 6
Section 6
UBA Pro RT/RQ™ Series Banknote Recycler
Calibration and Testing
6. Remove the Recycler from the RQ Transport.
7. To start the Test, set the UBA Pro DIP Switch #8
to
OFF
8. The Belts of the Transport Unit will start running
in the normal rotation direction when the Feed
Motor functions properly.
9. Set the UBA Pro DIP Switch #8 to
ON
to end the
test.
Feed Motor Reverse Rotation Test (RQ Trans-
port)
To run the Feed Motor Reverse Rotation Test on
the RQ Transport side, proceed as follows:
1. Remove electrical power.
2. Set the DIP Switches of the UBA Pro Unit as
below (Figure 6-136).
3. Set the DIP Switches of the RQ Unit as below
4. Apply electrical power.
5. Confirm that the Status LED/Collect Button is lit
at
Green
Color and then turns off.
6. Remove the Recycler from the RQ Transport.
7. To start the Test, set the UBA Pro DIP Switch #8
to
OFF
8. The Belts of the Transport Unit will start running
in the normal rotation direction when the Feed
Motor functions properly.
9. Set the UBA Pro DIP Switch #8 to
ON
to end the
test.
Figure 6-134
Feed Motor Normal Rotation Test
(RQ Transport) 4
Figure 6-135
Feed Motor Normal Rotation Test
(RQ Transport) 5
DIP Switch #8 OFF
ON
1
2
3
4
5
6
7
8
Figure 6-136
Feed Motor Reverse Rotation Test
(RQ Transport) 1
DIP Switches #1, #2, #6, #8 ON
ON
1
2
3
4
5
6
7
8
Figure 6-137
Figure 6-137
Feed Motor Reverse Rotation Test
(RQ Transport) 2
DIP Switches #2, #8 ON
ON
1
2
3
4
5
6
7
8
NOTE: Wait for the Status LED to turn off
in order to run the test properly.
Figure 6-138
Figure 6-138
Feed Motor Reverse Rotation Test
(RQ Transport) 3
Green
ON
OFF
Figure 6-139
Figure 6-139
Feed Motor Reverse Rotation Test
(RQ Transport) 4
Figure 6-140
Figure 6-140
Feed Motor Reverse Rotation Test
(RQ Transport) 5
DIP Switch #8 OFF
ON
1
2
3
4
5
6
7
8