© 2020, JAPAN CASH MACHINE CO., LTD.
6 - 2 8
Section 6
UBA Pro RT/RQ™ Series Banknote Recycler
Calibration and Testing
4. Apply electrical power.
5. Confirm that the Status LED/Collect Button is lit
at
Green
Color and then turns off.
6. To start the Test, set the UBA Pro DIP Switch #8
to
OFF
7. Remove the Recycler from the RQ Transport.
8. Pull down the Front Transport Unit to block the
Note Position Sensor 4 through 6.
9. The RQ Unit’s Status LED will be lit at Cyan
when the Sensors function properly.
10. Set the UBA Pro DIP Switch #8 to
ON
to end the
test.
Note Position Sensor D - F Test
(RQ Transport)
To run the Note Position Sensor D - F Test on the
RQ Transport side, proceed as follows:
1. Remove electrical power.
2. Set the DIP Switches of the UBA Pro Unit as
below (Figure 6-152).
3. Set the DIP Switches of the RQ Unit as below
4. Apply electrical power.
5. Confirm that the Status LED/Collect Button is lit
at
Green
Color and then turns off.
6. To start the Test, set the UBA Pro DIP Switch #8
to
OFF
NOTE: Wait for the Status LED to turn off
in order to run the test properly.
Figure 6-149
Figure 6-149
Note Position Sensor 4 - 6 Test
(RQ Transport) 3
Green
ON
OFF
Figure 6-150
Note Position Sensor 4 - 6 Test
(RQ Transport) 4
DIP Switch #8 OFF
ON
1
2
3
4
5
6
7
8
Figure 6-151
Figure 6-151
Note Position Sensor 4 - 6 Test
(RQ Transport) 5
Figure 6-152
Figure 6-152
Note Position Sensor D - F Test
(RQ Transport) 1
DIP Switches #1, #2, #6, #8 ON
ON
1
2
3
4
5
6
7
8
Figure 6-153
Figure 6-153
Note Position Sensor D - F Test
(RQ Transport) 2
DIP Switches #1, #4, #8 ON
ON
1
2
3
4
5
6
7
8
NOTE: Wait for the Status LED to turn off
in order to run the test properly.
Figure 6-154
Figure 6-154
Note Position Sensor D - F Test
(RQ Transport) 3
Green
ON
OFF
Figure 6-155
Figure 6-155
Note Position Sensor D - F Test
(RQ Transport) 4
DIP Switch #8 OFF
ON
1
2
3
4
5
6
7
8