P/N 960-100929R_Rev. 3 {EDP #148849}
© 2012, Japan CashMachine Co., Limited
2 - 1 6
Section 2
iVIZION® Series Next-Generation Banknote Acceptor Unit
Installation
O
PERATIONAL
F
LOWCHART
(C
ONTINUED
1)
Figure 2-18 depicts a typical iVIZION
®
SS Banknote flow process (Validation).
b) Is Banknote Unacceptable?
a) Is Validation Result OK?
c) Output the Denomination Value Signal
d) Receive Stacking Command?
e) Reject Banknote
f) Continue Transporting Banknote
g) Is Banknote sent to Stacker?
A) Begin Validating
h) Output a VEND Signal)
i) Retry 3 times?
j) Stop Performance: Output Abnormal
Signal (*1)
*1 When Abnormal Output Signal condition occurs, remove the Banknote causing the malfunction and re-apply power to the Unit, or send a Reset
Command to the Banknote Acceptor.
k) Banknote Stacking
l) Is Stacker Full?
m) Stop Performance: Issue Output Stacker
Full Signal (*2)
C) Return To Stand-by Mode (See Figure 2-17).
*2 When a Stacker Full signal occurs, remove the Banknotes from the Cash Box and re-install it into its fully seated position. The iVIZION will the
automatically re-initialize itself.
Figure 2-18
iVIZION SS Banknote Acceptor Operational Flowchart (Part 2 - Validating)