P/N 960-100929R_Rev. 3 {EDP #148849}
© 2012, Japan CashMachine Co., Limited
4 - 8
Section 4
iVIZION® Series Next-Generation Banknote Acceptor Unit
Disassembly/Reassembly
Validation Sensor FPC Cable
Removals
To remove the Validation Sensor FPC Cables,
proceed as follows:
1. Remove the two (2) Validation Sensor FPC
Cables (See Figure 4-28 a
1
& a
2
) from the
Validation Unit.
CIS/Transmissive Light & Upper UV
Sensor Removals
To remove the CIS, the Transmissive Light and the
Upper UV Sensors proceed as follows:
1. Push out the two (2) Alignment Pins (See Figure
1
& a
2
) retaining the two (2) Limit Stops
1
& b
2
) inside the Unit, and
individually remove the two (2) Stops from the
Validation Unit.
2. Carefully spread both side of
iVIZION
®
Head
FR “A” Frame apart (See Figure 4-30 c
1
& c
2
),
and lift the Upper Validation Section (See Figure
4-30 d) up and out of the Validation Unit.
3. Remove the six (6) mounting Screws (See Figure
1
through a
6
) retaining the upper
iVIZION
®
BG 85B Head Assembly (See Figure
4-31 b) to the lower Validation Unit.
Figure 4-28
Validation Sensor FPC Removal
a
1
a
2
Dashed Line
for Fold Up
Solid Line
for Fold Down
NOTE: Carefully observe the Up and Down
Fold Line indications shown by the two (2)
Cyan
Arrows in Figure 4-28, and DONOT
rebend them in an opposite direction!
NOTE: When installing new FPCs, fold-up
along the Solid Lines and fold-down along
the Dashed Lines before setting them in
place. Once an FPC is folded, DONOT
refold it back again or in the opposite
direction once folded!
NOTE: When the Unit is reassembled, the
FPCs should be reinstalled as illustrated by
the
Blue
paths shown in Figure 4-29.
Figure 4-29
Validation Sensor FPC Reassembly
NOTE: When reassembling the Unit,
ensure that the right and left side Pins are
correctly repositioned when reset into
place.
Figure 4-30
Upper Validation Part Removal
a
1
a
2
b
1
b
2
d
c
1
c
2
Figure 4-31
iVIZION Head BG85B Removal
a
1
a
2
a
3
a
4
a
5
a
6
b