P/N 960-100929R_Rev. 3 {EDP #148849}
© 2012, Japan CashMachine Co., Limited
6 - 1 1
Calibration and Testing
iVIZION® SeriesNext-Generation Banknote Acceptor Unit
Section 6
Performance Test Tool Requirement
using a PC
Figure 6-55 illustrates and list identifies the Tools
and Equipment Interconnects required to perform a
PC iVIZION
®
Performance Test.
Performance Test Items using a PC
Table 6-2 lists the available Performance Test Items
and their purpose using a PC for testing.
PC Performance Test Preparation
Perform following steps to begin the Performance
Test Preparation Procedure:
1. Turn the iVIZION
®
Unit’s Power Switch
OFF
.
2. Remove the Transport Unit from the Frame.
3. Set 8-Position DIP Switch #8 to
ON
.
4. Place the Transport Unit into the Frame.
5. Turn the iVIZION
®
Unit’s Power Switch
ON
.
The Status LED will light a stable
Blue
Color.
6. Launch the “
JCM Tool Suite Standard Edition
”
Application. The Screen shown in Figure 6-57
will appear when the application becomes acti-
vate.
7. Mouse-click on, and hold-down the “Service
Mode” selection pull-down Menu (See Figure 6-
Performance Test
”
from the Pull-Down Menu Sections (See Figure
8. Activate
the
“
iVIZION Test Item VerX.XX
” Appli-
cation and the Screen shown in Figure 6-58 will
automatically appear.
Table 6-2
PC Performance Test Items
No. Test Item
Test Purpose
Status LED
Stand-
by
Operating
1
Motor
Normal
Rotation
Testing the Transport
Motor rotation in a
Banknote intake
direction
Blue
Lit
Yellow
Flashes
2
Motor
Reverse
Rotation
Testing the Transport
Motor rotation in a
Banknote reject
direction
3
Stacker
Motor
Testing the Stacker
Motor’s movement
4
Cycle
Movement
Testing sequential
movement from
Banknote trans-
portation to stacking
at regular intervals
without Banknotes
5
Status
LED
Indication
Testing the Status LED
Indications
Red
Green
Blue
6
Sensor
ON/OFF
Testing each Sensor’s
Performance
Blue
Lit
7
DIP
Switch
ON/OFF
Testing the 8-Position
DIP Switches
Performance
8
Banknote
Acceptanc
e
Testing Transportation,
Validation, Stacking
and Reject
Performance, and the
Vend Signal Output
Blue
Lit
Extinguished
(Out)
9
ICB
Setting
(Reading
Ticket)
Checking the ICB
Enable/Disable
Setting of the ICB
Machine No.
Figure 6-55
PC Performance Test Tools Required
a
b
d
d
1
d
2
e
c
a) iVIZION Device
b) Power Supply
c) PC (OS: Windows XP) (iVIZION USB Driver
Installed)
d) USB Cable
d
1
) USB A Terminal
d
2
) USB Mini-B Terminal
e) Application Software*
(JCM Tool Suite Standard Edition)
*. Contains USB Downloader, Sensor Calibration, Performance Test
programs and Utility.
Figure 6-56
DIP Switch #8 Set ON
Figure 6-57
JCM Tool Suite Standard Edition
Screen
a
b
Figure 6-58
iVIZION Test Item VerX.XX Screen
a
b
c
d
f
i
g
h
e