www.javad.com
60
Stake Out Alignments
Stake Out Alignments
This portion of the manual was prepared by Mikhail Drakin, dated July
11, 2014 and with much appreciation is presented here.
Contents
Data Model (
p. 60
)
Tutorial — Creating an Alignment (
p. 62
)
Creating Horizontal Alignment (
p. 63
)
Creating Vertical Alignment (
p. 71
)
Defining Cross-Sections (
p. 76
)
Entering Offset Points (
p. 79
)
Modifying the Alignment (
p. 80
)
Staking (
p. 81
)
Stake Settings (
p. 81
)
Stake Modes (
p. 87
)
Stake-out alignments functions in Triumph LS allow
to perform stake-out of simple roads or linear features
with or without cross-sections based on projects de-
signed beforehand. The system provides for keying in
prepared data, doing simple editing, previewing the
entered project and performing actual stake out.
Alignments are always specified in projected or local
CRS (that is, “in meters/feet”).
Data Model
An alignment consists of the following elements:
Horizontal Alignment
— definition of the alignment
centerline (a curve) in horizontal plane, setting corre-
spondence between station value (length along the
curve) and (northing, easting) coordinates. The hor-
izontal alignment has definite start (not necessarily
zero) and end station values, and beyond these end-
points is implicitly extended by straight lines tangent
to the curve at endpoints (Figure 1).
Figure 1
Summary of Contents for TRIUMPH-LS
Page 1: ...U S E R S G U I D E TO T H E T R I U M P H L S E Version 20160121 ...
Page 17: ...www javad com 17 Introduction ...
Page 39: ...www javad com 39 Collect Screens ...
Page 59: ...www javad com 59 Stake Out Points ...
Page 91: ...www javad com 91 Stake Out Alignments ...
Page 93: ...www javad com 93 Using ShapeTags and Codes Data Structure ...
Page 105: ...www javad com 105 Using ShapeTags and Codes ...
Page 149: ...www javad com 149 Localization ...