![JAI Vehicle Imaging Subsystem 300 Installation Manual Download Page 92](http://html.mh-extra.com/html/jai/vehicle-imaging-subsystem-300/vehicle-imaging-subsystem-300_installation-manual_631589092.webp)
Page 80
VIS CAM 300/400 Installation Manual
Appendix B: J-Panel Functional and Connector Description
6.7 X6, X7: 24V DC Power
FIGURE 74.
Signal from J-panel #1
6.7.1 Functionality
The J-Panel has one input for 24V DC (X6). There is one unfused output (X7) and four fused outputs for
Camera 0 (connector X1, fused 2A), Camera 1 (connector X2, fused 2A), Light Sensor (connector X3,
fused 2A) and RS485-to-ethernet Converter (connector X8, fused 300mA).
It is possible to reset all fuses and they also reset automatically (PTC type) after removal of excessive
load. The three power LED indicators are electrically located between the fuse and connector and the
status of the fuse is therefore indicated on the LED: when the LED is green the load is ok, when the
LED is red an overload condition is present.
FIGURE 75.
Principle in the power distribution.
Summary of Contents for Vehicle Imaging Subsystem 300
Page 2: ...Page ii Vehicle Imaging Subsystem 300 400 ...
Page 12: ...Page xii List of Tables ...
Page 114: ...Page 102 VIS CAM 300 400 Installation Manual ...
Page 115: ......