![JAI Vehicle Imaging Subsystem 300 Installation Manual Download Page 18](http://html.mh-extra.com/html/jai/vehicle-imaging-subsystem-300/vehicle-imaging-subsystem-300_installation-manual_631589018.webp)
Page 6
VIS CAM 300/400 Installation Manual
Preparing for installation
2
Preparing for installation
2.1 Installation Preparation
To prepare for installation, consider the fundamental requirements for an effective deployment of the
Vehicle Imaging Subsystem. There are two basic ways to position the camera: over the lane or beside
the lane. Figure 3 and Figure 4
depict a typical over-lane installation. Figure 7 and Figure 8 on page 13
depict a typical beside-lane camera installation.
2.1.1 Over Lane Positioning
Over lane camera mounting is always employed when the road width being monitored contains more
than two lanes of traffic, when a convenient overhead structure is already in place, or when preventing
vandalism is a paramount concern.
FIGURE 3.
Typical Over Lane Site Layout
Summary of Contents for Vehicle Imaging Subsystem 300
Page 2: ...Page ii Vehicle Imaging Subsystem 300 400 ...
Page 12: ...Page xii List of Tables ...
Page 114: ...Page 102 VIS CAM 300 400 Installation Manual ...
Page 115: ......