EN
Page 4
4.8 Spare parts and diagrams ...............................................................................................................................23
4.8.1 Overview of frame with material hopper and star feeder ..............................................................................................23
4.8.2 Mixing zone spare parts list ..........................................................................................................................................25
4.8.3 Water fitting ................................................................................................................................................................26
5 Transport and storage ............................................................................................................................. 30
5.1 Safety notices for transport ............................................................................................................................30
5.2 Transport inspection ........................................................................................................................................30
5.3 Damage report .................................................................................................................................................30
5.4 Complaints .......................................................................................................................................................30
5.5 Packaging .........................................................................................................................................................30
5.6 Transport of the used machine in vehicle ......................................................................................................31
5.7 Storage .............................................................................................................................................................31
6 Installation ............................................................................................................................................... 31
6.1 Delivery condition of the machine .................................................................................................................32
6.2 Connecting the compressor ............................................................................................................................32
6.3 Mounting / dismounting the mixing zone ....................................................................................................32
6.4 Installing the mixing coil .................................................................................................................................33
6.5 Connecting the electrical control system .......................................................................................................33
6.6 Mounting the pump unit (rotor / stator / pressure gauge) ..........................................................................33
6.7 Installing the star feeder .................................................................................................................................33
6.8 Installing the water measuring system ..........................................................................................................34
6.9 Checking the direction of rotation of the machine .......................................................................................35
6.10 Setting the water quantity ...........................................................................................................................36
6.11 Regulating the water pressure .....................................................................................................................36
6.12 Material preparation .....................................................................................................................................36
6.12.1 Adjusting the material consistency .............................................................................................................................37
6.13 Preparing the machine ..................................................................................................................................37
6.14 Starting the machine .....................................................................................................................................37
7 Commissioning ....................................................................................................................................... 38
7.1 Adding material to the material hopper ........................................................................................................38
7.2 Opening and emptying bags of material .......................................................................................................38
7.3 Changing material ...........................................................................................................................................38
7.4 Change of location on the construction site .................................................................................................38
8 Operation, use .......................................................................................................................................... 39
8.1 Checking operating performance ...................................................................................................................39
8.2 Checking the consistency of the material ......................................................................................................39
8.3 Correcting flow fluctuations ...........................................................................................................................39
8.4 Work break/end of work .................................................................................................................................39
9 Areas of application ................................................................................................................................ 39
10 Cleaning & decommissioning ............................................................................................................... 40
10.1 Cleaning process ............................................................................................................................................40
10.2 After cleaning ................................................................................................................................................41
11 Maintenance ........................................................................................................................................... 42
11.1 Maintenance plan ..........................................................................................................................................42
11.2 Dirt trap sieve in the water inlet ..................................................................................................................42
11.3 Dirt trap sieve in the pressure reducing valve .............................................................................................42
11.4 Set values .......................................................................................................................................................42
11.5 Pump and star feeder motor .........................................................................................................................42
12 Faults, causes and solutions ................................................................................................................. 43
13 Dismantling and disposal ..................................................................................................................... 46
13.1 Safety ..............................................................................................................................................................46
13.2 Dismantling ....................................................................................................................................................46
13.3 Disposal ..........................................................................................................................................................46
14 Systems ................................................................................................................................................... 47
14.1 EC declaration of conformity ........................................................................................................................47
14.2 General Terms of Business of the company INOTEC GmbH ........................................................................48
14.3 Circuit diagram for inoCOMB Maxi Power...................................................................................................49
15 Order form .............................................................................................................................................. 50
16 Index ....................................................................................................................................................... 51
17 Locations ................................................................................................................................................ 52