Page 11
EN
Chapter 4 Assembly and function
NOTE
Note the optimum assembly sequence.
1. Assemble the pump unit (rotor/stator/pressure flange/
pressure gauge) with both tie rods at the lower end of
the green mixing zone. For easier installation, the com-
plete mixing zone incl. motor can be placed at an angle.
2. Open the eccentric lock on the motor and move it
away to the side. Push the mixing coil into the mixing
zone. Then move the motor back again and close the
eccentric lock. Ensure that the mixing coil is connected
to the motor and rotor of the pump unit via the motor
bracket.
3. Connect the input socket to the external (on-site) pow-
er supply (400 V / 32 Hz)
4.3 Components
7
3
5
6
2
4
1
4.3.1 Description of the components
Item
Component
1
Frame with wheels, material hopper,
star feeder and star feeder motor
2
Pump unit (mixing zone with mixing coil,
rotor / stator with mortar pressure gauge)
3
Mixing pump motor
4
Switching cabinet
5
Air fitting (not visible)
6
Water fitting
7
Compressor