906-0731-04 Rev. B Sept. 2012
Page 53 of 68
7
Remove the damaged cable by
pressing on locking tab and pulling
cable downwards.
8
Remove any excess RTV from the
case. Insert and tighten the two
included 4-40 X 3/16 screws holding
the new USB Connector to the front
case. Dress the USB Connector cable
along the case and over the SPO2 flex
cable.
9
Attach USB Connector cable to its
mating connector on the CPU PCB.
Make sure tab locks the cable in place.
10
Apply RTV Sealant around USB PCB
and allow to dry.
11
Place the front case assembly over the
vent module and tighten the (2) 4-40
X ¼ screws unto the dovetail
mounting bracket. Reconnect the
ribbon cable unto the PIM PCB. Make
sure the two locking “ears” lock into
position.
12
Attach the back case to the vent
module and align cover with handle,
air intake housing and dovetail
mounting studs. Insert and tighten the
included (2) 10-32 Keps nuts and the
(4) 6-32 X 2” screws.
13
Tighten the (4) 8-32 X 3 screws on the
outer air intake.
14
Perform HiPot Testing then perform
Functional Test using the RCS.