906-0731-04 Rev. B Sept. 2012
Page 33 of 68
13
Make sure the SPO2 Flex Cable lays
flat against the front case and is
assembled correctly into the UIM
Bracket and SPO2 Isolation Shield.
Insert and tighten the two M2.5 X
5mm screws holding the SPO2 cable
to the front case.
14
Remove any excess RTV sealant from
the SPO2 flex cable and USB PCB.
Tighten the two 4-40 X 3/16 screws
holding the USB PCB to the front case.
Apply RTV sealant to USB PCB and
SPO2 flex cable. Allow to dry/cure.
15
Place the included power knob on the
new membrane panel switch - align
with flat on switch – insert the
included 6-32 X ¼ set screw and
tighten. Push the included selector
knob on the membrane panel switch -
align with flat on switch .
16
Place the front case assembly on to
the bezel and tighten the included (7)
4-40 X ¼ screws.
17
Place the front case assembly over the
vent module and tighten the (2) 4-40
X ¼ screws unto the dovetail
mounting bracket. Reconnect the
ribbon cable unto the PIM PCB. Make
sure the two locking “ears” lock into
position.
18
Attach the back case to the vent
module and align cover with handle,
air intake housing and dovetail
mounting studs. Insert and tighten the
included (2) 10-32 Keps nuts and the
(4) 6-32 X 2” screws.
19
Tighten the (4) 8-32 X 3 screws on the
outer air intake.
20
Perform HiPot Testing then perform
Calibration and Functional Test using
the RCS.