906-0731-04 Rev. B Sept. 2012
Page 51 of 68
12
Apply RTV Sealant around the SPO2
Flex Cable and allow to dry.
13
Dress the USB Connector cable along
the case and over the SPO2 flex cable.
14
Attach USB Connector cable to its
mating connector on the CPU PCB.
Make sure tab locks the cable in place.
15
Place the front case assembly over the
vent module and tighten the (2) 4-40
X ¼ screws unto the dovetail
mounting bracket. Reconnect the
ribbon cable unto the PIM PCB. Make
sure the two locking “ears” lock into
position.
16
Attach the back case to the vent
module and align cover with handle,
air intake housing and dovetail
mounting studs. Insert and tighten the
included (2) 10-32 Keps nuts and the
(4) 6-32 X 2” screws.
17
Tighten the (4) 8-32 X 3 screws on the
outer air intake.
18
Perform HiPot Testing then perform
Calibration and Functional Test using
the RCS.