Selenio X100
Installation and Operation Manual
165
Parameters
ADS Clean 79
Frame Delay 35
Timecode 73
Passthrough in DTS Neural Surround 113
Password, default 24
PC network settings 19
Pinouts 7
Power requirements 11
Power save control 92
Power supply replacement 152
Presets 95
Proc amp 37
Proc Bypass 28
Profanity or Program Delay 32
–
Program delay module installation 162
Pushbutton controls 27
Q
QuickTime 23
R
Rack mounting the X50 11
Remote control 21
–
Removing covers 148
Reset button 27
Returning a product xi
Revision history of the manual ix
Ribbon cable 150
RoHS compliance xi
Rotary control shaft replacement 156
S
Safety
precautions with lasers 141
standards and compliances xi
terms and symbols xii
Sample Rate Conversion 36
insertion and extraction examples 66
Serial port pinouts 7
Serial port termination 15
Servicing 147
–
SFP input/output specifications 131
SFP modules 4
Shipping information x
Signal flow 9
Silverlight 23
Siting requirements 4
SMPTE 334M VANC standard 72
SNMP support 25
Software key options 5
Specifications 122
SRC control 74
Status button 27
Streaming 61
Subnet Mask 18
Support bracket and relief bar installation 11
System presets 95
System requirements 23
T
Teletext system 72
Temperature range for operation 4
Test signal generator 61
Test tone specifications 88
Thumbnail streaming 61
Timecode 73
U
Unpacking information x
V
VANC 46
VBI Line Delete 62
VBI Transfer 62
V-Bit parameter 83
VI, WSS, and AFD 46
via file plugin 57
Video output and routing 28
–
Video sync and delay 35
W
WEEE compliance xii
Wet cleaning fiber connections 144
White Slope 38
Summary of Contents for Selenio X100
Page 8: ...Selenio X100 Installation and Operation Manual viii...
Page 21: ...Selenio X100 Installation and Operation Manual 9 Figure 1 5 X100 Signal Flow...
Page 22: ...Selenio X100 Installation and Operation Manual 10...
Page 38: ...Selenio X100 Installation 26...
Page 158: ...Appendix A Laser Safety Guidelines 146...
Page 178: ...166...