3-10
TS2900 Tape Autoloader Setup, Operator, and Service Guide
Figure 3-9. Creating the rail assemblies
6.
Install the rail assemblies into the rack (Figure 3-10). Ensure the three holes in the
front of the unit align with the 1U space marked on the vertical rails in Step 2.
Secure the rails to the rack using four flat-head screws on each side of the rack.
Use both of the two screw locations on the rear of the rack rail (Figure 3-6). Use
the
top
and
middle
screw locations on the front of the rack rail (Figure 3-5).
Figure 3-10. Installing the rail assemblies
a29z0018
7
9
a29z0020
9
9
Summary of Contents for System Storage TS2900
Page 2: ......
Page 10: ...viii TS2900 Tape Autoloader Setup Operator and Service Guide...
Page 14: ...xii TS2900 Tape Autoloader Setup Operator and Service Guide...
Page 22: ...xx TS2900 Tape Autoloader Setup Operator and Service Guide...
Page 24: ...xxii TS2900 Tape Autoloader Setup Operator and Service Guide...
Page 36: ...1 12 TS2900 Tape Autoloader Setup Operator and Service Guide...
Page 78: ...3 34 TS2900 Tape Autoloader Setup Operator and Service Guide...
Page 114: ...4 36 TS2900 Tape Autoloader Setup Operator and Service Guide...
Page 136: ...5 22 TS2900 Tape Autoloader Setup Operator and Service Guide...
Page 192: ...A 22 TS2900 Tape Autoloader Setup Operator and Service Guide...
Page 220: ...D 10 TS2900 Tape Autoloader Setup Operator and Service Guide...
Page 230: ...F 4 TS2900 Tape Autoloader Setup Operator and Service Guide...
Page 232: ...G 2 TS2900 Tape Autoloader Setup Operator and Service Guide...
Page 238: ...H 6 TS2900 Tape Autoloader Setup Operator and Service Guide...
Page 255: ......
Page 256: ...Part Number 45E3877 Printed in USA GC27 2212 00 1P P N 45E3877...