2.4.1 Single UPS............................................................................................................................................................................ 41
2.4.2 Parallel System................................................................................................................................................................... 41
2.4.3 Dual-Bus System................................................................................................................................................................41
2.5 Optional Components......................................................................................................................................................... 42
3.1 Installation Preparations.................................................................................................................................................... 44
3.1.1 Site.......................................................................................................................................................................................... 44
3.1.1.1 Dimensions....................................................................................................................................................................... 44
3.1.1.2 Installation Environment............................................................................................................................................. 45
3.1.1.3 Installation Clearances................................................................................................................................................. 46
3.1.2 Tools and Instruments..................................................................................................................................................... 46
3.1.3 Preparing Power Cables.................................................................................................................................................. 48
3.2 Transportation, Unpacking, and Checking................................................................................................................... 52
3.3 Installing a Single UPS........................................................................................................................................................ 55
3.3.1 Installing a UPS Cabinet..................................................................................................................................................55
3.3.2 Installing Batteries............................................................................................................................................................ 60
3.3.3 Installing Optional Components.................................................................................................................................. 60
3.3.3.1 Installing Antiseismic Kits............................................................................................................................................60
3.3.3.2 Connecting an Ambient T/H Sensor........................................................................................................................ 61
3.3.3.3 Connecting the iBAT..................................................................................................................................................... 62
3.3.3.4 Installing a Battery Grounding Failure Detector................................................................................................. 62
3.3.4 UPS Cable Connection Reference.................................................................................................................................63
3.3.5 Routing Cables................................................................................................................................................................... 64
3.3.5.1 Top Cable Routing......................................................................................................................................................... 64
3.3.5.2 Bottom Cable Routing.................................................................................................................................................. 69
3.3.6 Connecting a Remote EPO Switch...............................................................................................................................77
3.3.7 Connecting Communications Cables.......................................................................................................................... 78
3.4 Installing a Parallel System............................................................................................................................................... 78
3.4.1 Installing the UPSs............................................................................................................................................................ 79
3.4.2 Connecting Power Cables............................................................................................................................................... 80
3.4.3 Connecting Signal Cables............................................................................................................................................... 82
3.5 Verifying the Installation.................................................................................................................................................... 84
4.1 Powering On and Starting the UPS................................................................................................................................ 88
4.1.1 Powering On the UPS...................................................................................................................................................... 88
4.1.2 Initial Startup...................................................................................................................................................................... 88
4.1.2.1 Obtaining the Startup Password...............................................................................................................................89
4.1.2.2 Settings Wizard............................................................................................................................................................... 90
4.1.3 Starting the Inverter......................................................................................................................................................... 92
4.1.4 Powering On Loads...........................................................................................................................................................93
4.1.5 (Optional) Setting Parameters for the BCB Box..................................................................................................... 93
4.2 Shutting Down and Powering Off the UPS..................................................................................................................94
UPS5000-E-(30 kVA–120 kVA)-FM
User Manual
Contents
Issue 03 (2022-01-30)
Copyright © Huawei Technologies Co., Ltd.
v