3.3.2 Installing Batteries
D ANGER
● Before installing batteries, read through the battery safety precautions and
install batteries as instructed in the delivered battery installation guide.
● Install the batteries from the lower layer to the upper layer to ensure the
system is secure and balanced.
Install a battery rack and batteries. For details, see the battery installation guide
delivered along with the batteries.
3.3.3 Installing Optional Components
3.3.3.1 Installing Antiseismic Kits
Procedure
Step 1 Determine the installation positions for the antiseismic kits based on the delivered
marking-off template, and mark mounting holes.
Figure 3-15 Antiseismic kit mounting hole positions
Step 2 Secure two antiseismic kits to the front and rear of the cabinet using twelve
M5x16 screws and four M12 screws.
UPS5000-E-(30 kVA–120 kVA)-FM
User Manual
3 Installation
Issue 03 (2022-01-30)
Copyright © Huawei Technologies Co., Ltd.
60