Step 8
Install the cover. For details, see
Installing the Cover of a G530 V2
Step 9
Install the G530 V2. For details, see
.
Step 10
Power on the G530 V2. For details, see
3.2 Powering On the Compute Node
----End
6.4.6 TPM
6.4.6.1 TPM
Installing the TPM
Step 1
Power off the G530 V2. For details, see
3.1 Powering Off the Compute Node
Step 2
Remove the G530 V2. For details, see
Step 3
Place the G530 V2 on the ESD floor.
Step 4
Remove the cover. For details, see
Removing the Cover of a G530 V2
.
Step 5
Determine the location for installing the TPM. See
Figure 6-39
Location of the TPM
Step 6
Take a spare TPM out of its ESD bag.
Step 7
Insert the TPM vertically downwards into the connector on the mainboard. See (1) in
.
FusionServer G5500 Server
User Guide
6 Optional Part Installation
Issue 02 (2017-12-15)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
158