3.
Insert the G530 V2 horizontally into the chassis. See (3) in
.
4.
Close the ejector lever on the G530 V2. See (4) in
Step 4
Check the indicator status after the G530 V2 is powered on.
2.3 Front Panel Indicators and Buttons
----End
4.5 Installing an I/O Module
The G5500 is connected to the external network through the I/O module. If the I/O module is
not installed, install it in the I/O module slot of the G5500 before installing the G5500.
l
For details about I/O modules, visit
.
l
The NICs on the G5500 must be compatible with I/O modules.
For details about installing an I/O Module, see
4.6 Internal Cabling
4.6.1 SAS Cable
Table 4-2
Cable description
Cable
Description
BOM Number
SAS cable
Connects the RAID
controller card to a
mezzanine card.
04052026
FusionServer G5500 Server
User Guide
4 Setup
Issue 02 (2017-12-15)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
65