7.10.1 Data Sheet for GBTS Commissioning
This section provides the data sheet that is used to record the process and results of the GBTS
commissioning.
Table 7-5
Data sheet for GBTS commissioning
Site Name
GBTS Type
Commission Time
Commissioning
Engineer
Commissioning
Mode
□
Local USB + remote commissioning
□
SMT/LMT + remote
commissioning
□
Remote commissioning
Commissioning
Result
□
Successful
□
Failed
Commissioning Item
Conclusion Handling
Exceptional Case
Commissioning
Preparation Phase
The resources required for
commissioning are available.
The commissioning
requirements are met.
Commis
sioning
Phase
Local
eNodeB
Commiss
ioning
Through
the USB
Storage
Device
The GBTS is upgraded.
The GBTS hardware is
functional.
SMT/
LMT +
Remote
Commiss
ioning
You have logged in to the
GBTS through the SMT.
The GBTS board and logical
objects are available.
The active software version is
correct.
The transmission between the
BBU and the MRFU/
RRU3908 is normal.
Only the alarms related to the
transmission are reported.
7 Commissioning the MBTS by Using Local Maintenance
Terminal and M2000
3900 Series Multi-Mode Base Station
Commissioning Guide
7-42
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Issue 02 (2010-07-30)