Status of the LED on
the USB Storage
Device
Status of the RUN LED on the
LMPT
Downloading the data
configuration file from the
USB storage device
Blinking
Blinking (on for 0.125s and off for
0.125s)
Activating the software
On
Blinking (on for 0.125s and off for
0.125s)
Activating the data
configuration file
On
Blinking (on for 0.125s and off for
0.125s)
Resetting the base station
On, and then off
On, and then blinking (on for 0.125s
and off for 0.125s)
Base station operating
normally
Off
Blinking (on for 1s and off for 1s)
WARNING
Do not remove the USB storage device or reset the eNodeB during the download or activation
of eNodeB software and data configuration through the USB storage device. After the files are
downloaded, the eNodeB automatically activates the software and data configuration. Then, the
eNodeB resets.
Step 4
When the download and activation are successful, unplug the USB storage device, and proceed
with checking the status of the LEDs and rectifying the faults.
----End
Postrequisite
CAUTION
The eNodeB software package contains the LMT software. To reduce the eNodeB deployment
duration, some of the files of the LMT software are automatically downloaded to the eNodeB
four hours after the eNodeB deployment. If you need to use the LMT immediately after the
eNodeB deployment, run the
SPL SOFTWARE
command on the M2000 after the eNodeB is
connected to the M2000. Set
Delay Download File Supply Flag
to
YES(Supply File that
Support Delay)
. Thus, the remaining files of LMT software are downloaded to the eNodeB.
6 Commissioning the MBTS by Using USB and M2000
3900 Series Multi-Mode Base Station
Commissioning Guide
6-20
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Issue 02 (2010-07-30)