5.
Obtain the commissioning report from the M2000. For details, see
6.
View the commissioning report to check the MBTS operating status. For details, see
5.9 Checking the Operating Status of the Base Station
.
7.
Verify eNodeB services. For details, see
5.10 Testing the Basic Services of the
8.
Confirm the MBTS commissioning task. For details, see
----End
7.2 Running the GBTS SMT
To run the GBTS site maintenance terminal (SMT), you need to first set the IP address of the
SMT client, connect the base station and the SMT, and then log in to the SMT.
7.2.1 Setting the IP address of the SMT Client
7.2.2 Connecting the SMT Client and the Base Station
This section describes how to log in to the base station through the SMT.
7.2.1 Setting the IP address of the SMT Client
This section describes how to set the IP address of the SMT client. The IP address of the SMT
client is on the same network segment as the IP address (192.168.0.72/255.255.255.0) of the
GTMU.
Prerequisite
The TCP/IP protocol is applied on the SMT client.
Procedure
Step 1
To set the IP address of the SMT client, perform the following steps. This section takes the
Windows XP operating system as an example. Choose
Start
>
Setting
>
Control Panel
.
Step 2
Double-click
Network Connections
in the displayed
Control Panel
window. Right-click
Local
Area Connection
in the displayed dialog box.
Step 3
Choose
Properties
from the shortcut menu. The
Local Area Connection Properties
dialog
box is displayed.
Step 4
Select
Internet Protocol (TCP/IP)
, and click
Properties
. The
Internet Protocol (TCP/IP)
Properties
dialog box is displayed.
7 Commissioning the MBTS by Using Local Maintenance
Terminal and M2000
3900 Series Multi-Mode Base Station
Commissioning Guide
7-6
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Issue 02 (2010-07-30)