Option
Description
Manual Transmission
Detection Intervention Is
Required
1. Select the check box in front of
Intervene Transmission
.
2. Perform
For details about how to manually intervene GBTS
transmission detection, see
Manual Transmission
Detection Intervention Is
Not Required
Perform
Step 5
Click
OK
. The M2000 starts commissioning the MBTS automatically.
l
After the deployment starts, the M2000 deploys only the GBTS.
l
4.5 Automatic Commissioning of the MBTS on the M2000
.
----End
Postrequisite
During the commissioning, you can monitor the MBTS commissioning status through the
M2000 to handle commissioning exceptions in time and ensure that the commissioning can be
performed successfully. For details, see
4.6.1 Viewing the Progress and Status of an MBTS
4.4 Manually Intervening the MBTS Transmission
Detection
This section describes how to manually intervene GBTS transmission during MBTS
commissioning. By intervening GBTS transmission, you can query the real-time status of the
E1/T1 port to ensure that the GBTS transmission is normal and that you can proceed with the
GBTS deployment.
Prerequisite
The automatic software commissioning already starts, and the GBTS transmission is being
manually intervened.
Context
If you have set intervention on the commissioning task when starting the commissioning, the
task switches to the intervention status after the OML detection is complete, regardless of
whether the OML is normal. In addition, the function of querying the E1/T1 port status is
provided.
Procedure
Step 1
Choose
Configuration
>
Auto Deployment
>
MBTS Auto Deployment
. The
MBTS Auto
Deployment
window is displayed.
4 Commissioning the MBTS in GU Mode on the M2000
3900 Series Multi-Mode Base Station
Commissioning Guide
4-12
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Issue 02 (2010-07-30)