
46
Performing basic configuration tasks
switch:admin>
licenseport -reserve 0
4.
If all port reservations are assigned, select a port to release its POD license. You must disable the port
first by entering the command
portdisable
<
port num
>.
5.
Enter the
licensePort
--
release
command to remove the port from the POD license.
switch:admin>
licenseport --release 0
6.
Enter the
licensePort
--
show
command to verify there is an available port reservation.
switch:admin>
licenseport --show
24 ports are available in this switch
Full POD license is installed
Dynamic POD method is in use
24 port assignments are provisioned for use in this switch:
12 port assignments are provisioned by the base switch license
12 port assignments are provisioned by a full POD license
10 ports are assigned to installed licenses:
10 ports are assigned to the base switch license
0 ports are assigned to the full POD license
Ports assigned to the base switch license:
1*, 2*, 3*, 4*, 5*, 6*, 8*, 21, 22, 23
Ports assigned to the full POD license:
None
Ports not assigned to a license:
0, 7, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20
7.
Enter the
switchEnable
command to bring the switch back online.
switch:admin>
switchenable
Releasing a port
Releasing a port removes it from the POD set; the port will appear as unassigned until it comes back
online. Persistently disabling the port will ensure that the port cannot come back online and be
automatically assigned to a POD assignment.
To release a port from a POD set
1.
Connect to the switch and log in as admin.
2.
Enter the
switchDisable
command to take the switch offline.
switch:admin>
switchdisable
3.
Enter the
switchShow
command to verify the switch state is offline.
4.
Enter the
licensePort
--
release
command to remove the port from the POD license.
switch:admin>
licenseport --release 0
5.
Enter the
licensePort
--
show
command to verify the port is no longer assigned to a POD set
.
switch:admin>
licenseport --show
24 ports are available in this switch
Full POD license is installed
Dynamic POD method is in use
24 port assignments are provisioned for use in this switch:
12 port assignments are provisioned by the base switch license
12 port assignments are provisioned by a full POD license
10 ports are assigned to installed licenses:
10 ports are assigned to the base switch license
0 ports are assigned to the full POD license
Ports assigned to the base switch license:
1*, 2*, 3*, 4*, 5*, 6*, 8*, 21, 22, 23
Ports assigned to the full POD license:
None
Ports not assigned to a license:
0, 7, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20
switch:admin>
6.
Enter the
switchEnable
command to bring the switch back online
.
Summary of Contents for AA979A - StorageWorks SAN Switch 2/8V
Page 1: ...HP StorageWorks Fabric OS 5 3 x administrator guide Part number 5697 0244 November 2009 ...
Page 16: ...16 ...
Page 20: ...18 ...
Page 24: ...24 Introducing Fabric OS CLI procedures ...
Page 116: ...118 Maintaining configurations ...
Page 170: ...172 Managing administrative domains ...
Page 200: ...202 Installing and maintaining firmware ...
Page 222: ...224 Routing traffic ...
Page 274: ...286 Administering FICON fabrics ...
Page 294: ...306 Working with diagnostic features ...
Page 350: ...362 Administering Extended Fabrics ...
Page 438: ...440 Configuring the PID format ...
Page 444: ...446 Configuring McData Open Fabric mode ...
Page 450: ...452 Understanding legacy password behaviour ...