COOLING SYSTEM
7-8
Remove the reserve tank cap.
Pump out the coolant with a fluid evacuator to drain
the reservoir tank.
Remove the bolt and sealing washer.
Fill the coolant from the filler neck until the coolant
starts dripping from the bolt hole.
Stop filling and install the bolt with a new sealing
washer.
Fill the system with the recommended coolant
through the filler opening up to the filler neck.
Fill the reserve tank to the upper level line and
install the tank cap.
Bleed air from the system as follows:
1. Start the engine and let it idle for 2 – 3 minutes.
2. Snap the throttle 3 – 4 times to bleed air from the
system.
3. Stop the engine and add coolant up to the filler
neck.
4. Install the radiator cap.
Install the following:
– screw and reserve tank maintenance lid
– screw and radiator maintenance lid
– under cover (page 3-9)
– floor side cover (page 3-8)
– luggage box (page 3-5)
– maintenance lid (page 3-4)
RESERVE TANK
TANK CAP
WASHER
BOLT
BOLT HOLE
FILLER NECK
“LOWER” LEVEL
“UPPER” LEVEL
Summary of Contents for SH300I 2006
Page 54: ...MEMO...
Page 55: ...2 1 2 2 TECHNICAL FEATURES HEATER LESS O2 SENSOR 2 2 UNIT SWING ENGINE LAYOUT 2 3...
Page 58: ...MEMO...
Page 216: ...MEMO...
Page 242: ...CYLINDER PISTON 10 2 CYLINDER PISTON COMPONENT LOCATION...
Page 250: ...MEMO...
Page 270: ...MEMO...
Page 296: ...MEMO...
Page 314: ...MEMO...
Page 394: ...MEMO...
Page 422: ...MEMO...
Page 440: ...MEMO...
Page 456: ...MEMO...
Page 484: ...MEMO...
Page 499: ...24 1 24 24 WIRING DIAGRAMS STD type 24 3 ABS type 24 4...
Page 509: ...MEMO...