C-20
C70 Capacitor Bank Protection and Control System
GE Multilin
C.5 IEC 61850 IMPLEMENTATION VIA ENERVISTA UR SETUP
APPENDIX C
C
The
IED Section
node describes the configuration of an IED.
Figure 0–9: SCD FILE STRUCTURE, IED NODE
C.5.6 IMPORTING AN SCD FILE WITH ENERVISTA UR SETUP
The following procedure describes how to update the C70 with the new configuration from an SCD file with the EnerVista
UR Setup software.
1.
Right-click anywhere in the files panel and select the
Import Contents From SCD File
item.
2.
Select the saved SCD file and click
Open
.
842794A1.CDR
IED Section (IED 1)
AccessPoint (name)
Server
Authentication (none)
LDevice (inst)
LN0 (InType, InClass, inst)
DataSet elements
DOI elements
Inputs
GSEControl elements
ReportControl elements
ExtRef (iedName, ldInst, prefix, lnClass, lnInst, doName, daName, intAddr)
Other ExtRef elements
Summary of Contents for UR Series C70
Page 2: ......
Page 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Page 344: ...5 220 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 586: ...D 10 C70 Capacitor Bank Protection and Control System GE Multilin D 1 OVERVIEW APPENDIXD D ...