![GE UR Series C70 Instruction Manual Download Page 113](http://html.mh-extra.com/html/ge/ur-series-c70/ur-series-c70_instruction-manual_130387113.webp)
GE Multilin
C70 Capacitor Bank Protection and Control System
4-19
4 HUMAN INTERFACES
4.3 FACEPLATE INTERFACE
4
1.
Use the knife to lift the LED label and slide the label tool underneath. Make sure the bent tabs are pointing away from
the relay.
2.
Slide the label tool under the LED label until the tabs snap out as shown below. This will attach the label tool to the LED
label.
3.
Remove the tool and attached LED label as shown below.
Summary of Contents for UR Series C70
Page 2: ......
Page 10: ...x C70 Capacitor Bank Protection and Control System GE Multilin TABLE OF CONTENTS ...
Page 344: ...5 220 C70 Capacitor Bank Protection and Control System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 586: ...D 10 C70 Capacitor Bank Protection and Control System GE Multilin D 1 OVERVIEW APPENDIXD D ...